mparrish2965 mparrish2965
  • 03-07-2022
  • Engineering
contestada

A feature control frame must be connected to

Respuesta :

tcs1257621
tcs1257621 tcs1257621
  • 03-07-2022

Answer:

Surface Parallelism When a surface is to be parallel to a datum plane, the feature control frame is connected by a leader to the surface, or to an extension line from the surface.

Explanation:

Answer Link

Otras preguntas

I=$310 P=$1,000 t=5 years
What is the density of a liquid that has a volume of 20.0 ml and a mass of 330 grams?
A rectangle has an area of 384 m. The length and the width of a rectangle are changed by a scale factor of 0.75. What is the area of the new triangle
How did new industrial technologies influence the course of world war i?
Farmer brown built a rectangular pen for his chickens using 12 meters of fence. • he used part of one side of his barn as one length of the rectangular pen. • h
What did Jimmy Carter base his views on foreign-policy?
Solve all the solutions of sinsquarex - cossquarex = 0 in the interval 0,2pi
Which correctly describes the reaction between potassium and excess water?
How is parasitism different from commensalism? a. both organisms benefit in parasitism and only one organism benefits in commensalism. b. one organism benefits
Find the missing value. sin x = .65