hannahgrace31511 hannahgrace31511
  • 03-11-2021
  • Mathematics
contestada

A chef can finish a catering job in 4hr. His student can do the same job in 12hr. How long will it take them both to do the job if they work together

Respuesta :

shayy1616 shayy1616
  • 03-11-2021
12 divided by 4 equal 3
Ans:3hrs
Answer Link

Otras preguntas

How many combinations of 3 students can a teacher choose from 32 students?   A. 96
2/5+4/7 estimate: decide if each addend is closer to 0 or closer to 1. then estimate the sum or difference. this is a fraction question.
type the requested verb form of this verb. future progressive tense: soar
What does el muslo mean?
A patient needs to receive 35 mg of amoxicillin orally. The drug is available in a strength of 100 mg/tsp, How many tsp of the drug must the patient swallow to
On average Exante Express trains are 50km/hr faster than Paral passenger trains. A Paral passenger train requires 60% more time then Exante train to travel 1800
Prove identity tan 3x−tan 2x−tanx = tan 3xtan 2xtanx
Hitler intended to defeat great Britain by
Which of the following writers did not come from Ireland? a) W. B. Yeats b) James Joyce c) Seamus Heaney d) Oscar Wilde e) none of the above; all came from
Which of the following nutrient cycles has its largest reservoir in the atmosphere? A) Carbon cycle B) Nitrogen cycle C) Potassium cycle D) Phosphorus cycle E)