jocelynmullens
jocelynmullens jocelynmullens
  • 04-05-2021
  • Computers and Technology
contestada

HURRY please!!!!

Order the steps for creating a chart in PowerPoint.
Go to the Insert tab.
Choose the type of chart.
Click OK
Click the Chart button.

HURRY please Order the steps for creating a chart in PowerPoint Go to the Insert tab Choose the type of chart Click OK Click the Chart button class=

Respuesta :

jellooo26 jellooo26
  • 04-05-2021
1. Go to insert tab
2. Click the chart tab
3. Choose the type of chart
4. Click OK
Answer Link
calliemoris0017
calliemoris0017 calliemoris0017
  • 10-05-2022

Answer:

the person above is correct

Explanation:

edge

Ver imagen calliemoris0017
Answer Link

Otras preguntas

Let g(x)=x^2+bx+11. The point (-1,8) lies on graph of g. Find value of b.​
Which equation is represented by the graph below? a.y = e Superscript x b.y = e Superscript x Baseline minus 1 c.y = l n x d.y = l n x minus 1
nombra al menos dos aspectos en los que el Renacimiento español exhibe un carácter doble
Why is Dally being rude to the girls? The Outsiders
Which of the following is how we find slope from a graph?
The sum of two numbers is twenty. Three times the smaller is equal to two times the larger. Find the two numbers.
What are three ways you can correctly cite research?
help me please: Geometry Circle. Find OB​
HELP “Translate the following statement in algebraic expressions.”
(NEED DONE QUICK) Two angles are supplementary. One of the angles measures 4(2x+9) and the other angle measures 2(4x-8) what is the value of x?