skyrobbin19 skyrobbin19
  • 01-03-2021
  • Mathematics
contestada

a worker takes 1 week to fill 9 crates of squash. at this rate, how long will it take to fill 720 crates

Respuesta :

Bittersweetem Bittersweetem
  • 01-03-2021
It would take 80 weeks
Answer Link

Otras preguntas

Which of the following best shows the commutative property of addition?4 + 5 = 5 + 44 + 5 = 94 + 5 = 4 - (-5)4 + 5 = 4 + (2 + 3)
F 19.00 Fluorine Using the information on the figure above, report the atomic number and atomic mass of fluorine.
solve for x. Enter your answer in interval notation using grouping symbols. x^2+9x<-20
The graph represents function 1 and the equation represents function 2: A graph with numbers 0 to 4 on the x-axis and y-axis at increments of 1. A horizontal st
Which point below is a solution to the equation y = 2x + 3
are fossil fuels a renewable energy source because they are formed from living things​
5 Star And Thanks =10 Answers 5 Star,Thanks And Brainiest =All
The table below shows the approximate percent of students who sent applications to two colleges in various years since 1985.A regression equation for this line
Convert 25°C to Fahrenheit. Use the formula F = (1.8)C + 32°. 58.8°F 102.6°F 77°F 52°F plz help
The y-component of the force F which a person exerts on the handle of the box wrench is known to be 70 lb. Determine the x-component and the magnitude of F.