A critical activity is________________.a. an activity that consumes no time but shows precedence between events. b. a milestone accomplishment within the project. c. an activity with zero slack. d/ the beginning of an event.

Respuesta :

Ritmeks
Ritmeks Ritmeks
  • 09-03-2020

Answer:

C

Explanation:

Critical activity is the sequential activities from beginning to the end of a project. A lot of projects have a single critical path, although some projects may have more than one critical activity which depends on the flow logic utilized in the project.

Answer Link

Otras preguntas

Name two types of adaptations having to do with an animals actions
how many miles does the Mediterranean sea stretch from east to west
The length of a rectangle is 5 inches less than three times its width. The perimeter is 86 inches. Find the length and width. Write an equation and solve. Plea
find two consecutive odd integers whose sum is 72
a biome that has a large amount of rainfall,high temperatures, and a poor soil is a
the area of the base of a pyramid is 18 square yards. the height of the pyramid is 5 yards what is the volume of the pyramid
Take a look at the statement below: Fish meal is better than artificial fertilizers. How could this statement be revised to make it a hypothesis?
a mother places her hand on a hot stovetop. The stimulus reaches the sensory neaurons of her fingertips. What nerve pathway will this stumulus signal contunue t
in what part of chloroplasts do dark reactions occur?
what is 0.09 1/10 of what is 0.04 1/10 of what is 0.6 1/10 of what is 0.1 1/10 of