liluv4590 liluv4590
  • 02-04-2019
  • Mathematics
contestada

A potter works 4 days a week, makes 14 pots per day on average, and charges $24 a pot. Money per 4-day workweek?

Respuesta :

greubel80
greubel80 greubel80
  • 02-04-2019
Step by Step:

14 average pots x 4 days a week = average money made

14x4= 56

56 pots a 4-day week x 24$ a pot

56x24 = 1344$
Answer Link

Otras preguntas

Jim’s allowance is $1.20 per week. Stan’s is 25¢ per day. How long will they have to save, if they save both their allowances together, before they can get a m
A farmer hauled in 120 bales of hay. Each of his cows ate 1 1/4 bales. How many cows the farmer feed?
Does every point lie in a quadrant?
How did scientists discover the common structure of cells?
“The genetic code is universal.” Explain this statement.
Find the value of x.  Round to nearest hundredth if necessary.
How do scientists use seismic waves to determine the interior structure of Earth?
How do you Factor c(squared)-8c ??
Natalie earns $2.50 for each cd she sells and $3.50 for each dvd she sells.  Natalie sold 45 dvds last year.  She earned a total of $780 last year selling cds a
By the mid-1700s, the largest city in the colonies was (A) New York (B) Boston (C) Philadelphia (D) Charleston (E) Wilmington, Delaware